Home > Facilities > Proposed Integrated Facilities

Proposed Integrated Facilities

A State-Of-The-Art Integrated Facility complying with the latest standards & safety norms is planned. to be setup at Santacruz. The Integrated Facility mainly consists of :
1. Hydrant system at T2 terminal
2. Connector pipeline between Integrated fuel farm & Hydrant System.
3. Integrated fuel farm Facility
The integrated Fuel Farm facility would have:
• 5 nos. above ground JET A1 fuel storage tanks with total capacity of 47500 KL.
• receipt facility of JET A1 through pipelines and / or tank trucks
• delivery facilities of JET A1 from the fuel farm to the aircraft through the Hydrant network as well as through refuellers .
• fully automated fuel farm Facility